Showing posts with label Project. Show all posts
Showing posts with label Project. Show all posts

Saturday, January 10, 2026

Intercepted Orochi Comms

Leaked R&D Memo

Project Mimir: Post-Incident Analysis

[SYS_LOG: OROCHI-NET-SEC-TKO-SVR-08]
[TIMESTAMP: 2025-12-30T04:18:33Z]
[PRIORITY: URGENT]

Full containment failure on Mimir Progeny-7. The anima-gel matrix destabilized at 04:11Z, resulting in what can only be described as a... cascade failure. The psychic resonance harmonics went off-scale before the sensors failed. We have a complete blackout on all monitoring feeds from Lab C.

The primary and secondary blast doors have sealed, but the tertiary bulkhead is reporting anomalous pressure variances. Worse, the on-site team is unresponsive. Their last broadcast was just... screaming.

I've scrubbed the local server logs as per protocol 7-Delta, but this is beyond a simple clean-up. The resonance signature... it's not dissipating. It's coalescing. We need to initiate the Scylla Protocol immediately. The asset is lost, and what's left in there is something else entirely.

  • ACTION: Initiate Scylla Protocol.
  • STATUS: Asset Lost.
  • NOTE: Do not attempt local access. Await Tier 4 instructions.