Leaked R&D Memo
Project Mimir: Post-Incident Analysis
[SYS_LOG: OROCHI-NET-SEC-TKO-SVR-08]
[TIMESTAMP: 2025-12-30T04:18:33Z]
[PRIORITY: URGENT]
Full containment failure on Mimir Progeny-7. The anima-gel matrix destabilized at 04:11Z, resulting in what can only be described as a... cascade failure. The psychic resonance harmonics went off-scale before the sensors failed. We have a complete blackout on all monitoring feeds from Lab C.
The primary and secondary blast doors have sealed, but the tertiary bulkhead is reporting anomalous pressure variances. Worse, the on-site team is unresponsive. Their last broadcast was just... screaming.
I've scrubbed the local server logs as per protocol 7-Delta, but this is beyond a simple clean-up. The resonance signature... it's not dissipating. It's coalescing. We need to initiate the Scylla Protocol immediately. The asset is lost, and what's left in there is something else entirely.
- ACTION: Initiate Scylla Protocol.
- STATUS: Asset Lost.
- NOTE: Do not attempt local access. Await Tier 4 instructions.
No comments:
Post a Comment